DayPilot Forums

DayPilot is the best open-source Outlook-like calendar control for ASP.NET.
DayPilot Pro Demo (Calendar control)
» DayPilot Pro live demo (Calendar control)
DayPilot Pro Demo (Scheduler control)
» DayPilot Pro live demo (Scheduler control)
Home » How To » How to advance the calendar to the time the last event was added.

How to advance the calendar to the time the last event was added.

Hi,

I am using the calendar in the day view and as the user add events to the calendar, I would like it to scroll (advance) to the time the last event was added (instead of showing 'Scroll down' or 'Scroll up'). Is this possible?

Thanks

Anonymous - 3/31/2008 7:54:15 PM
Post reply