Using the Scheduler and cannot figure out how to assign an event directly to a child in a resource. Example:
Parent (type of marketing) = Email Marketing
Children (list of vendors) = Constant Contact, Pioneer Press, K95FM, Wrangler Radio.
I want to assign a specific event (an email blast) to "Pioneer Press" or "Constant Contact", etc. I have all the events showing under the parent and the children not showing at all.
Ultimately I want to see schedule of "Email Marketing" with the various events showing next to the child resource they belong to.