Is it possible to drag and drop multiple events from the external source to scheduler?

Asked by Robin
3 months ago.

Hi,

I want to drag and drop multiple events from an external source to the scheduler. Is it possible?

Thanks

Answer posted by Dan Letecky [DayPilot]
3 months ago.

Unfortunately, this is not possible at the moment.

Out of curiosity - what is your use case?

Comment posted by Robin Biju
3 months ago.

Hi Dan Letecky,

Thank you for your response.

I’m currently developing a production planning board. And there is a list of events (as external source). I’d like to be able to drag multiple events from that list and drop them onto the scheduler. Ideally, this would involve either drag-and-drop functionality or the ability to select multiple events from the list and drop them into the scheduler simultaneously.

If you have any suggestions or workarounds to achieve this, I would greatly appreciate your input.

Thanks in advance!

Comment posted by Robin Biju
3 months ago.

Hi Dan Letecky,

We are currently evaluating the Scheduler and considering purchasing the DayPilot Pro. Your insights on the above requirement would be greatly appreciated.

Thank you

Comment posted by Dan Letecky [DayPilot]
3 months ago.

Thanks for the update - we are checking the options. I’ll keep you updated.

Comment posted by Dan Letecky [DayPilot]
3 months ago.

Another question - how do you expect the events to be arranged in the Scheduler when there are multiple of them? Should they share the same resource and time, use the same resource at subsequent times, or follow a different arrangement?

Comment posted by Robin Biju
3 months ago.

Hi Dan,

Please refer to the attached screenshot. My requirement is to drag multiple items from the list below to the scheduler. The 'Required Prod Days' column represents the duration of each event. When dragging and dropping multiple items, the same resource can be used, and the time will correspond to the value in the 'Required Prod Days' column.

Thanks!