Right-click drag behaviour differences between Calendar and Scheduler
3 months ago.
Hi Dan,
The Calendar and Scheduler behave slightly different when right-clicking and dragging a time frame:
-
The calendar only allows a click and prevents dragging a time frame
-
The scheduler allows both a click or click and drag of a time frame
Is there an architectural reason for the difference in behaviour or did it just evolve over time?
We’d love to be able to also right-click and drag in the calendar component if possible.
Cheers
Leo
DayPilot