in scheduler if i select one day it goes across 2 days
so if i want to make an event on the 25/09/2013 the start date is 25/09/2013
and end date is 26/09/2013 i think its because the cell duration is 1440
so it adds 1440 minutes to the start time any way to change this so it uses 12am as the starting time
rather than current time
or so the end date is same as start date