Is it possible to drag an event from the Calendar control to a date visible in the Navigator control?
I would like to, for example, move an event from the day visible on the calendar, say 8/1/2011, to 9/15/2011, a day visible on the navigator.
This is not yet possible but it's in the wishlist.
Hi Dan,
Any update on this?
tx,
Rik