search envelope-o feed check
Home Unanswered Active Tags New Question

Active Questions

Chnage BusinessStart and End hours programmatically on command call back

Hi Dan, Everything worked fine with my DayPilotNavigator(DPN) & DayPilotCalender(DPC) until I decided to change BusinessBeginsHour & BusinessEndsHour programmatically. So here is my scinario. I have ...

Javascript: daypilot calendar, iterate though all events

Hi, Is it possible to iterate though all events (or search for specific ones based on the data id or tag property) using daypilot calendar & JavaScript. Where a specific tag contains a value access t...

All Day Events now 'broken' in v4.7.1399

Answered: This property is called AllDayEnd and has two possible values: DateTime (DataEndField specifies an exact date point, including time) Date (DataEndField specifies a day only - Date part of the DateTim...

Adding Separators After CallBack

Can you only add separators to the Scheduler atpage load? I try to add a separator(s) after a callback where I change the StartDate, but the separators do not show. Thank you.

Event Title readable at all times. - Scheduler

Hi, We are evaluating the DayPilot control. One of the requirements is the event title must be readable at all times, i.e. the event text not cut off in the browser but also when printing. I am so fa...

XSS ISSUE

Analysis Tool: Microsoft Code Analysis Tool .NET (CAT.NET) CTP Problem: A cross-site scripting vulnerability was found through a user controlled variable that enters the application at :0 through the...

DayPilot Scheduler moving jobs beyond current view

Is it possible to move a job beyond the current view with Scheduler. If i grab a job and try to move it beyond the currently displayed view nothing happens. It should scroll to allow the job to be mo...

scheduler in masterpage

Hi to everyone, I'm trying to put the daypilot scheduler onto a page which inherits a master page. But the scheduler does not scroll to today' s date. Is there anyone wo can tell me what I'm doingwro...

Daypilot Calendar - Make all events non editable and allow new events to be added only to open slots

I have made configured the Calendar to display exactly how I want with multiple resources and columns. I want to render all the existing events as readonly (not editable, not movable). Also I want to...

Move Event Bug

This bugs only happens in Windows Vista SP1 IE8. Wenn i move an event downit jumps to the top. It only happens we the calendar is scrolled down. To recreate this bug go to: https://www.daypilot.org/d...

How to add week numbers to Daypilot navigator

Hi! Is there a way to add week numbers to Daypilot Navigator (like in Outlook) ?

Code Behind Usage: Calendar and Navigator cannot be instantiated in code behind?

Sorry for the repost, but I've spent nearly two days now trying to get the calendar/month controls and the navigator control to work inside a SharePoint WebPart and I have learnt some new facts which...

Navigator and Calendar not connecting

Hi, I'm struggling getting a navigator and month calendar connected inside a (SharePoint) Webpart. This restricts me to doing all coding in the code behind. To isolate the problem I've recreated the ...

Day Pilot Thems Issue

i am not Able to apply the thems in .net i am using Day pilot calender CssClassPrefix="calendar_silver_" the Css is in the CSS file and there is a MODULE folder as like day pilot demo but not able to...

Tag is not Working in Day pilot Calender on DayPilotBubble1_RenderContent

i am not able to see the re. Tag Property on Render Content on i can See my Code is That Is in .Net protected void DayPilotBubble1_RenderContent(object sender, RenderEventArgs e) { //if (e is RenderE...

Day pilot Calendar height issue

Hi,Not able to give fixed hieght to panel which contains daypilot calendar.It behaves wierdly kind of overlaps and streches out of the panel

DayPilotBubble & Master Page

Hello! I use DayPilotCalendar and DayPilotBubble controls. My trouble is : When DayPilotCalendar is on page without master page everything is OK. But when it is on a page wich has master page DayPilo...

DP Month and Context Menu applied in BeforeEventRender

DP v 5.7.1904, FF3.0.14, IE 8.0.6001, using DayPilot Month I'm trying to override the context menu on specific events in DayPilot Month. I've tried using the following, but it results in no DayPilot ...

VisibleStart Date of DaypilotMonth calendar is not accurate

Hi Dan, DaypilotMonth Controls Shows StartDate as 10-25-2009 and EndDate as 12-05-2009 for November month. But VisibleStart Date is 11-1-2009 (which is not correct) VisibleEnd Date is 12-06-2009 (whi...

DaypilotMonth Shows Repeated week for November month

Hi Dan, DaypilotMonth is repeating the last week for november month when i add BeforeCellRender event. Please look at below code. Design HTML Code --------------------------- <html xmlns="http://www....
Previous Questions 4521-4540 of 5307 Next