I want to perform an external drag from a gridview to a Scheduler with a linked navigator to select date.
If we select different date from the calendar, e.StartDate and e.EndDate will still be Today time, leads to incorrect calculation. There is also no shadow on the time slot when i drag the gridview items.
What are the problems that should cause this?