Answered: At this moment, the 100% Height feature is only available in the Pro version of the Monthly calendar. You can find information about feature availability in the table at the bottom of each docs page....
Hello, Is it possible to configure a different height for each header? For example I have 3 headers, Month, Day and Hours, and I want to have Month 40px height and Day, Hours height with a height of ...
"Hi, with Daypilot Scheduler < 7.0 is it possible to adjust the row height manually (maybe with some css overrides) to a fixed height ? In my specific case I need to limit the rows displayed for a re...
Hi, with Daypilot Scheduler < 7.0 is it possible to adjust the row height manually (maybe with some css overrides) to a fixed height ? In my specific case I need to limit the rows displayed for a res...
Answered: You can change the color of the background cells using BeforeCellRender event handler. You can change the cell CSS class using e.CssClass, you can also change the IsBusiness status using e.IsBusiness...
Answered: This is not possible in the Lite version. In the Pro version, you should be able to do this by creating a special CSS class and applying it to the event in BeforeEventRender (in CssOnly mode). Just n...
Answered: You can use updateHeight() on the client side: dps.updateHeight(); See also: * http://api.daypilot.org/daypilot-scheduler-updateheight/ This only works correctly in build 6.6.2339 an later ( http://w...