Questions Tagged
Angular Scheduler - Horizontal scroll position
Answered: It looks like the problem might be the scrollTo/scrollX/scrollY properties in the scheduler config object. If you add them to the config they will be re-applied whenever the Scheduler detects a chang...
toolTip not showing up
Answered: The toolTip is only displayed if a Bubble object (https://api.daypilot.org/daypilot-scheduler-bubble/) is not specified. In the current DayPilot Pro version, the bubble is initialized using a new Day...
Angular Scheduler Developer
Looking for a front end developer to work on a multi resource scheduling system. Minimum 3 years of experience working with angular. Minimum 9 years coding experience. If you want more information pl...
[DayPilot Pro for Angular] Calendar View does not automatically update events
Answered: Please make sure that you don't specify the [events] attribute in the template:
<daypilot-scheduler [config]="config" #scheduler></daypilot-scheduler>
If you specify the [events] attribute it wil...
DayPilot children rows don't show up
Answered: You need to add:
treeEnabled: true
to your config. See also: https://doc.daypilot.org/scheduler/resource-tree/
2 rows for one resource
Answered: It is possible to display two rows for each resource: 1. The resource id needs to be unique. This can be done by prefixing a certain string to the resource id, e.g. "R" + id for reservations rows, "I...
How-To get resource by mouse position
HI; I want to get the resource depending on mouse position (Y position) !.. Thank you
I cannot load the events when I put if(IsPostBack)
If I set the condition of IsPostBack, then the dayPIlot control doesn't load anything! I'm writing the same logic that comes in the trial. DayPilot 2018.43692 First assign in the load the start dates...
How can we detect if the start or end of an event was changed?
Answered: Hi Jens, The e.part object is an internal structure that shouldn't be used for calculations. The e.part.start/end properties hold start/end for rendering purposes only - it won't always correspond to...
hourWidth
Answered: Hi Otto, The groupBy: "Cell" option sets the time header cell width to match grid cells. If you want to increase the grid cell width you can use "cellWidth" property: https://api.daypilot.org/daypilo...
dp.width = "100%";
Answered: By default, the Scheduler is rendered inside a div (the placeholder div which you specify using the id parameter of the constructor) which fills the available width (display: block). What you see mig...
ViewType = WorkWeek -> Days=1 and StartDate not monday
Answered: To get the calculated start/end you can use visibleStart() and visibleEnd() methods: https://api.daypilot.org/daypilot-calendar-visiblestart/ https://api.daypilot.org/daypilot-calendar-visibleend/ Th...
ScrollTo Problem
Answered: This is my fix: jquery('.scheduler_default_scrollable').animate({ scrollLeft: jquery('.scheduler_default_separator').offset().left/2-100 }, 1000); Thanks!
Critical error, unable to build code on production environment
Answered: For the record: 1. Problem: Compilation error message: "Unexpected value 'DayPilotModule in ... node_modules/daypilot-pro-angular/daypilot-angular.min.d.ts' imported by the module '...'. Please add @...
Hide +/- boxes
Answered: You can hide the icons using treeImageWidth and treeImageHeight properties:
dp.treeImageWidth = 0;
dp.treeImageHeight = 0;
See also: https://api.daypilot.org/daypilot-scheduler-treeimageheight/ ...
Open source version of Kanban board
Answered: Unfortunately, the Kanban board component is only available in DayPilot Pro (paid version). See also the feature matrix: https://javascript.daypilot.org/feature-matrix/
Scheduler using parent100pct not working properly.
Answered: When using HeightSpec="Parent100Pct", it's necessary to set the parent height explicitly so the Scheduler can fill it. This can be done by setting its "height" CSS style or using "position:absolute" ...
a different row and event height
Answered: Yes, please see the following docs page: https://doc.daypilot.org/scheduler/row-height/
cellHighlighting - after event painting
Answered: The time range selection shadow (selection indicator) is always rendered in the layer below events. To make sure it's visible you can specify rowMarginBottom to add some extra space at the bottom of ...
Colors
Answered: Hello, I found a solution here in the forum and helpfiles. Thank you and best regards, Otto
dp.onBeforeEventRender = function(args) {
if (args.data.tags && args.data.tags.type === "important...
How to drebug the angular Application in angular2`
Hi all how To debug the angula application. how to put Break point , in the angular2 thanks and regards siddu
changes with mouse click
Answered: There is an onEventClick event handler which you can use to call a server-side endpoint using AJAX (to make the change persistent). You can also change the event color using DayPilot.Scheduler.events...
Loading problem
Answered: Unfortunately, the order of "scheduler_default_matrix_vertical_line" elements is not guaranteed. If you want to display vertical lines at specified locations (e.g. to mark end of day) you can use sep...
Timeheader doesn't scroll vertically
Hi Daypilot, I'm using very old version of DayPilot having version "1418". Now I have a problem with Daypilot Calendar. In my Calendar, I have around 30 days, when I scroll to see another dates, the ...
Wrap text in DayPilot Weekly Scheduler
Answered: The text wrapping is disabled by default - you can enable it using this property: https://api.daypilot.org/daypilot-scheduler-eventtextwrappingenabled/
regarding SAAS license
Answered: When you need to deploy multiple instances (e.g. for scalability reasons) you'll need to upgrade to a multi-server license (i.e. SaaS Team or SaaS Office).
Disabled cells for DayPilot.Calendar
Answered: Yes, it's in the plan - it will be introduced in one of the coming releases.
timeline assign date
Answered: Hi Otto, You can create DayPilot.Date object from an ISO string using a constructor:
var date = new DayPilot.Date("2019-05-04T12:00:00"); // "2019-05-04 12:00:00" works as well
See also: https:/...
Edit resource name with JavaScript
Hello. I‘ve seen, that it is possible to change the name of a resource/row inline. Is it also possible to do this outside of Daypilot with an external formular? Since now I didn’t found a way to do t...
Daypilot Javascript
Answered: After the 60 days has been completed, you either need to pay or the trail would end and you won't be able to use it further.