Answered: Yes, you can specify the icon using "Image" attribute of <MenuItem> tag: <daypilot:daypilotmenu id="DayPilotMenu1" runat="server" CssClassPrefix="menu_default" ShowMenuTitle="true"> <DayPilot:MenuIte...
Answered: This usually means there is a JavaScript error that prevents the callback from completing. 1. You should be able to the details of the error it in the JavaScript console. 2. Sometimes, the client-sid...
Answered: Most likely it is an increasing memory consumption that is slowing the page down. A few hints: 1. Make sure that you have DayPilot Pro version 8.1.1969 or later ( http://javascript.daypilot.org/daypi...
Answered: You can do this using UseEventBoxes=Never option: http://doc.daypilot.org/scheduler/exact-event-duration/ Just note that this is not DayPilot Lite, but DayPilot Pro. I'm removing the "lite" tag.
Answered: You should apply the theme using Theme property of the <DayPilot:DayPilotScheduler> tag like this: <DayPilot:DayPilotScheduler Theme="scheduler_8" ... /> Please note that you need to include the them...
Answered: It looks like a bug. Normally, you should be able to hide the time header using getTimeHeaders().clear(). Please let me check the problem. You can also try to set the header height to 0 as a workarou...
Answered: The latest DayPilot Pro for ASP.NET MVC version (8.1) includes an auto-detection mechanism that waits until the Scheduler becomes visible and fixes the layout. It looks like you might be using an old...
Answered: The format of the array items is described here: http://api.daypilot.org/daypilot-event-data/ See also the following tutorial, it includes PHP and ASP.NET MVC versions of the project: http://code.day...
Answered: If you load the data from the same source and update the source correctly both instances should display the same data. If you want to force an update from the client side you can use dp.commandCallBa...
Answered: 1. In the Scheduler ( http://javascript.daypilot.org/scheduler/ ), you have the following options: (1.A) X-Axis (Time) You can hide certain time periods. You can do it either using onIncludeCell (whi...
Answered: All main controls (Calendar, Scheduler, Month) let you specify a custom sorting rule: http://doc.daypilot.org/calendar/event-sorting/ http://doc.daypilot.org/month/event-sorting/ http://doc.daypilot....
Answered: As far as I can tell you can get this error if you create a DLL in C++ and use it in a C#/VB project and the functions are not exported properly. However, this is not the case of DayPilot which is wr...
Answered: The order of the resources (rows) follows the order of items in the Resources collection: http://doc.daypilot.org/scheduler/resource-loading/ The events are sorted automatically using a rule correspo...
Answered: The PNG image export is in the works and it will be available in the next release (8.2) - in a few weeks. You can find a preview of the implementation in the sandbox: http://javascript.daypilot.org/s...
Answered: You can find and modify the cells using cells.find(), cells.findXy() and cells.findByPixels() methods: http://api.daypilot.org/daypilot-scheduler-cells-find/ http://api.daypilot.org/daypilot-schedule...
Answered: The browsers don't allow setting the scrollbar position on elements that are hidden. The workaround is to call dp.enableScrolling() on the client side after the control becomes visible (where "dp" is...
Answered: This is by design - starting the time range selecting immediately it would prevent grid scrolling. You can configure the delay using tapAndHoldTimeout (the default value is 300ms): http://api.daypilo...
Answered: 1. In the Lite version, e.DataItem is only used for ViewType="Gantt". In that case, it stores the event source object (after calling DataBind()). In other modes e.DataItem.Source is null. In the Pro ...
Answered: In the latest build (8.1.2007) the resource.columns[] array supports .backColor and .cssClass properties (in addition to .html). Example: dp.resources = [ { name: "Room 101", id: "101", columns: [{ht...
Answered: 1. If you want to display row summaries, you can add one more row header column and display the data there: http://doc.daypilot.org/scheduler/row-header-columns/ 2. If you want to display column summ...
Answered: It looks like an old DayPilot.Mvc.dll is cached somewhere. The latest version of DayPilot.Mvc.dll (8.1.5813) works with client script version 1944. Client script version 707 is used by build 7.7.5654.
Answered: You can force a reload of the scheduler by calling .update(): http://api.daypilot.org/daypilot-scheduler-update/ With the progressive rendering options enabled (they are enabled by default) it is a r...
Answered: The "DEMO" indicates that you are using a trial version of DayPilot Pro. In order to remove it you need to purchase DayPilot Pro: http://www.daypilot.org/buy/
Answered: This happens because you access e.DataItem in your BeforeEventRender event handler but you don't load the events using DataBind() during the PostBack (ButtonRefresh_Click). The events are loaded from...
Dear all, when I create 2 subtasks, the superordinate task does not calculate to correct days. (Means beginning of the first task and end of the second task = complete duration for the superordinate